2024 | Professional
Entrant Company
Category
Client's Name
Country / Region
The existing and listed power plant area from 1924 could no longer be adapted for the changed new technical power plant parts, which is why the user decided to build a new building next to the existing one.
In order to be able to integrate the large-scale technology of a hydroelectric power plant, including its massive pipelines, into the environment and to avoid disturbing the historic existing building, we decided to let the new power plant recede into the background as much as possible. The massive new building was largely integrated into the site underground. The above-ground parts of the building are reduced to an upper water and an underwater area, which break out of the slope as individual elements. In the underwater area, a set-back incision is created below this massive wall, which is subordinate to the material. A cleanly accentuated black joint is created here, where the delivery and access areas as well as the technical and functional areas are located. The upper concrete disc is created with a three-dimensional concrete structure in the form of waves, which creates a connection to the ripples of the water surfaces. The incision underneath, using perforated, vertically arranged meander plates, creates the connection to the vertical steel lamellae – the screening systems – in the inlet areas of the power plant.
The inlet structure and the underwater building with power plant technology correspond in their architectural form and are connected to each other via the intensively greened slope.
Credits
Entrant Company
EIZO INTERNATIONAL LLC
Category
Residential Architecture - Urban Residential Design
Entrant Company
Tokyo Zokei University
Category
Student Design - Furniture Design
Entrant Company
EM Arquitectos
Category
Cultural Architecture - Religious and Spiritual Buildings